[1]
Álvarez-González, M., Mayo-Abad, O., Cerulia-Quiroga, M., Simil-Rodríguez, M. and Pérez-Expósito, R. 2016. Validation of the aseptic filling at the Parenteral Products Plant 3 in BioCen. Chemical Technology. 36, 3 (Jul. 2016), 379-391. DOI:https://doi.org/10.1590/2224-6185.2016.3.6.