Ramírez-Pérez, I., Alepuz-Llansana, H., Legrá-Legrá, A., Araujo-Escalona, E., & Leyva-Navarro, E. (2017). Substitution of the burning PRIOR SSB 10 for SSB7 in the Furnace 10 of the Company Major Ernesto Che Guevara. Chemical Technology, 37(1), 172-183. https://doi.org/10.1590/2224-6185.2017.1.14